Turlow - 2 - 210 MW -CFB power station

  • Writer: Germán Ibáñez
    Germán Ibáñez
  • Jun 19, 2020
  • 1 min read

In Turlow, Poland, replaced two pc boilers with two Pyro-power circulating fluidized bed boilers (Clean Coal Technology) and started to clean up an area nickname the Black Triangle Area in Poland. Ran and maintained the lotus 123 construction drawdown model that has Polish loan, 3 export credit facilities and one multinational development fund loans. Total project cost 287 Million. Project was completed in 1998.


 
 
 